News & Events

News & Events

News & Events

G8 Route Clearance Vessel in Asia

Mar 31,2021



G8 PLGR Vessel is available now in Asia for projects now. Cable Route Clearance activity before the cable installation to ensure the cable route is free of obstacles like FADs, OSCs and many other types of debris which are identified during the marine survey with G8 Route Clearence Vessel. Hazards & Obstruction on seabed and suspended in water may endanger the new cable or plough/trencher during the cable burial protection.


G8's CABLEPro Pre-Lay Grapnel Run (PLGR) operation is highly recommended for both shallow and deep-water cable installation. G8, a specialist team in Seabed Infrastructure Projects and Engineering, designs & performs PLGR and Route Clearance operation in-line with ICPCs recommended guidelines to ensure Cost Effective & hassle free cable lay and burial protection operation.

Feel free to contact our CablePro specialist for your Project:

Vincent.phang@G8-energy.com​​​​​​​

Mohan@G8-energy.com


G8 PLGR Brochure rev

G8 PLGR Brochure rev


Youtube: https://www.youtube.com/channel/UCj6Y6QKKQ6nppN7mvu2239A

LinkedIn: https://www.linkedin.com/company/g8-subsea-pte-ltd-sg

Share: